Operation of the LTM 1300 in Neuss

The entire road had to be closed for the dismantling of a TDK. In a very confined space, the TDK was lifted out of the construction site by the LTM 1300-6.2 with 96 t counterweight and 45.50 m lattice jib and an LTM 1100-5.1 as a tracking crane.