Operation in a confined space

The construction site was on Karolingerring right in the middle of Cologne city centre.

The performance of this crane operation was very delicate and could only be scheduled on a Sunday. The construction site was on Karolingerring right in the middle of Cologne city centre. The LTM 1100 was positioned between the rails and power lines of the KVB public transport on one side and  the trees on the other side.