Work on the Urfttsperre

For the refurbishment of the main relief tower of the Urft dam, the Liebherr LTM 1110-5.1 with base ballast has erected a construction crane at the dam.

 

The spill tower will receive a concrete outer shell and a ring foundation. This is to ensure that it remains stable even in the event of earthquakes.